Case Studies

Case Studies on real overhead material handling problems

Aug/7/2014
A customer needed to move equipment from the ground level exterior to the interior, third floor operating space of their facility. This level was accessed through an overhead, roll-up door that, per the customer’s constraints, could not be modified or replaced. More
Mar/3/2014
An East Coast motor service shop was experiencing chronic problems with a production bridge crane. Shupper-Brickle Equipment was called in to assess the situation and offer potential solutions. Should the bridge crane be repaired or replaced? More

Articles by Category

  About Shupper-Brickle Equipment
  Case Studies
  Glossary of Terms
  Need a Lift? The Hoist Guy's Blog
  Reference Data
  Safety Topics
  Specialty Applications
  Specifications
 

Contact Us!

We can answer any questions and we’re eager to help.

Thank you for Adding an Item to your cart

# of Items Added: 1
Total of Items Added: 0.00
Show CartShow Cart Continue Shopping